The owner has a direct contract with the consultant, who is usually an architect or engineer. The owner requesting the project-whether it’s a hotel, school, or something else entirely-has a set budget and the responsibility to make sure the project goals are met without overspending. There are three parties in a design-bid-build project: the owner, the consultant, and the contractor or builder. Once the design is complete, general contractors bid on the job based on their labor and construction costs, which opens the project up to market competition (and which theoretically lowers construction costs). A design team works with the project owner to prepare the programming, design the project, and draft the contract documents. The design-bid-build method is a linear approach to the design and construction of a building project. $75.00 USD | 34M Preview Course What is the design-bid-build project delivery method?